    US$ 0,23/dia Huawei FusionServer Xeon E7 4x10G VPS VMware 1GB RAM 30GB vSAN unmetered

    CloudLITE is based on:



    • 4-socket Huawei FusionServer RH5885 V3 servers based on Intel Xeon E7 CPUs and each server has 4 high-performance 10G Ethernet interfaces.
    • VMware VSAN virtual storage combines disks with a NL SAS interface and PCIe flash-cards in a single distributed data storage.
    • High-performance 10G Cisco Nexus switches.


    All the equipment is housed in our own DataLine NORD 3 data center in Moscow. The engineering and telecommunications infrastructure of the data center is dedicated and corresponds to Tier 3.

    Hourly billing and discounts for turned off servers


    https://cloudlite.ru/en/services/vds/linux

  2. #2
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239


    FusionServer RH5885 V3 Rack Server

    Huawei's FusionServer RH5885 V3 is a next-generation 4U 4-socket rack server with Intel® Xeon® E7 v3 or v4 processors that supports up to 96 cores.

  3. #3
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    DataLine NORD data centers - Moscou




    • 2720 racks
    • 4 data centers
    • 13688 m2
    • 28200 kVA
    • 2N UPS
    • N+1 cooling system
    • 2N fire extinguishing systems
    • 2N network infrastructure


    http://www.dtln.ru/tsod-nord

  4. #4
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239







    Refrigeration rooms based on the principle of "cold" and "hot" corridors.
    23-27 Celsius the temperature in the cold corridor

  5. #5
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    2N UPS








  6. #6
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    Segurança






    6645 parameters monitored in the system monitor data centers NORD

  7. #7
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239




  8. #8
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    2N fire extinguishing systems



    2N network infrastructure



    DataLine-IX: own point of traffic exchange

  9. #9
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    NORD-4 Data Center


    utilities



    computer rooms



    computer rooms



    cobertura


    The largest commercial data center in Russia. Launched in 2015. The design and facility are certified according to Uptime Institute TIER III Standard.

    • 2016 racks
    • 11 700 m2 floor area
    • 20 000 kVA
    • 8 computer rooms for 2016 racks
    • 6 rooms for 1512 racks are in operation



    http://www.dtln.ru/en/data-center-nord4

  10. #10
    WHT-BR Top Member
    Data de Ingresso
    Dec 2010
    Posts
    17,239

    Monitoração de temperaturas



    Computer rooms are equipped with Stulz two-circuit precision air conditioners. Each room is cooled by 14 air conditioners.



    A special technical floor is organised for pipelines of water and glycol circuits, heat exchanging units, pumps, expansion and storage tanks, automation and control system.



    2N redundant fire extinguishing system